Home
Krabi solar power solutions
Krabi solar power solutions
Krabi Off grid solutions
Krabi Off grid solutions
Krabi e-mobillity

Wholesaler & Retailer for Renewable Energy in Thailand and Asia

Why Solaris Green Energy

Why Choose Solaris Green Energy?

  • Knowledge of Solar Energy in Thailand
  • Experience in Renewable Energy
  • Access and knowledge of latest products
  • Ability to project costs and benefits
  • Experienced Installation Experts

Renewable energy in Thailand

Thailand has committed to increasing its use of renewable energy.

Business that use Green technology have a business advantage over their competitors.

Advantages include being less reliant on the grid, cost savings, Business Image and Many more.

While Thailand seemed to outshine ASEAN in solar power in 2015, the developments in 2016 showed delays and uncertainties. However, after only 470 MW solar power had been installed in 2014 and 722 MW in 2015, according to the latest data officially published by the Energy Regulatory Commission (ERC) 732 MW have been installed just in the first nine months of 2016. And 2017 promises to show real growth and continuing development. This opens seven (7) opportunities for foreign investors to participate in Thailand’s solar power energy.

Walking on sunshine: Thailand’s solar energy blueprint

Thailand is continuing its integrated energy blueprint, consisting of a gas plan, oil plan, the Energy Efficiency Plan (EEP), the Alternative Energy Development Plan (AEDP) and the Power Development Plan (PDP) with the Smart Grid Plan (SGP). The targeted percentage of renewable energy production seems to be increased in the future.

The political risk of a (retrospective) cancellation of renewable energy incentives is small, but not non-existing. Section 44 of the Interim Constitution (“S44IC”) will be still in place in 2017 and gives the army manned NCPO (National Committee for Peace and Order) full and uncontrolled authority to reshape the energy legislation and regulatory framework without grandfathering, loss compensation, legal or court protection.

Technical enhancements and cost reductions might bring governmental incentives to an end, should the production of photo-voltaic and the solar energy production reach competitiveness with traditional power production. The legal impacts of such technological improvement have to be awaited with excitement.

solar-farm-acquisition.jpg.001

 

A brief history of time in Thailand’s solar energy

The overall developments in Thailand’s legislation and governmental policy can be summarized as follows:

1993: Solar off-grid program for rural non-electrified areas for villages, schools, health care clinics and water pumping. 100% governmental support with regular maintenance, 30 MWp in total.

2007: Introducing of “Adder (Feed-in Premium)” policy for the VSPP and SPP for all renewable energy generation up to 90MWp. (Solar PV target: 500 MWp, Adder: 8 baht/kWh or 23 UScent/kWh for 10 years)

2010: Solar PV target: 2,000 MWp. Since there were huge applications, the Adder decreased to 6.5 baht/kWh (or 18.6 US cent/kWh) for 10 years and an application moratorium had been introduced since June 2010. 

2013: The solar PV target increased to 3,000 MWp. Solar farm: 2,000 MWp with Adder for 10 years. Solar Rooftop: 200 MWp with FiT 6-6.84 baht/kWh for 25 years. Solar for community 800 MWp with decreasing FiT for 25 years

2014: Solar PV target increased to 3,800 MWp. Solar farm 1,800 MWp with Adder for 10 years, solar farm 1,000MWp-applied before June 2010, changed from Adder for 10 years to FiT 5.66 baht/kWh for 25 years, solar rooftop 200 MWp with FiT 6-6.84 baht/kWh for 25 years and solar for community 800 MWp – changed to solar for governmental agencies and agricultural cooperatives – with FiT 5.66 baht/kWh for 25 years

2015: Phase 1 of the Agency and Agricultural Cooperatives Program (Agro-Solar)

2016: Pilot project for Solar PV rooftop (for self-consumption) of 100 MWp and phase 2 of the solar for government agencies and agricultural cooperatives. 67 projects have won the right to sell a combined 281.32 megawatts (MW) of solar power to the national electricity grid for 25 years. Under the 2016 pilot project, the Energy Policy Management Committee divided in a resolution as of February 24, 2016, the 100 MW into 10 MWp for households (below 10 kWp) and 40 MWp for commercial use for EGAT and PEA each.

Policy changes in 2017

1.  The new 40% target: Thailand’s current Alternative Energy Development Plan aims to promote alternative energy usage to 25% of energy consumption. Recently, energy policymakers seem to have revised this percentage to 40% of the country’s total power generating capacity by 2036. This new target would result in total renewable power-generating capacity to 40,000 MW in 2036, up from 19,600 MW under the previous plan. 

2. Firm, semi-firm and non-firm PPAs: Power purchasing agreements will change from non-firm to semi-firm or firm power delivery contracts. During peak times for the power source, the PPA will contain a legal obligation to supply electricity to the governmental utility. Possible quota are

  • 100% output at peak time
  • 65% output at off-peak

While “firm” means throughout the year, the “semi-firm” is defined as firm for six months of the year (including March till June) and non-firm for the remaining six months.

Underperformance might require the power producer to pay (liquidated?) damages. In addition, the terms and conditions of the PPA may be more flexible and subject to an aggressive bidding process. This will affect new licenses for solar, wind, biomass, biogas and waste-to-power energy PPAs with a combined capacity of 1,000 MW to be granted to investors this year.

3. Investor pre-screening: The ERC will screen investors for active business. Inactive investors are disqualified from current biddings. This has to be seen in the light of roughly 200 MW of projects that obtained licenses in 2016 but did not invest at all. The exact criteria for the activity test are not yet disclosed – and might not be fully disclosed in the future.

4. May 2017: Although the collapse in solar panel prices is an international commonness, Thailand’s solar industry requests an increase of the feed-in tariff rate from currently THB 4.12 to the rates of 2013 (THB 5.66) or even the THB 8.50 as of the year 2006.

Seven business opportunities to participate in Thailand’s second solar gold rush in 2017

Business case 1 – Agro-Solar 2: The year 2017 will see the realization of the delayed 518 MW Agro-Solar phase 2 tranche at a feed-in tariff rate of 5.66 baht/kWh over 25 years. These project will still require the cooperation with governmental agencies and agricultural cooperatives, which is far from being free and easy. Phase 2 caught public attention by a petition filed by 2,000 agriculture cooperatives to stop and drop embarrassing formalities of a public tender for a lucky draw decision by the government’s agency EPPO. At least the chances for a swift drive forward reach nearly zero.

Business case 2 – Agro-Solar 1: The successfully awarded 67 projects under the Agro-Solar phase 1 solar farm program with a combined capacity of 281 MW are on the market and some of them still open for a participation or joint venture.

Business case 3 – SPP hybrid firm (10+ – 50 MW): The Energy Policy and Planning Office (EPPO) will soon announce the new tender process “SPP hybrid firm” with a combined power-generating capacity of 300 MW. It will base on a firm PPA under which operators are obliged to supply an exact amount of power into the grid. To enable this, even when the sun does not shine, and the wind does not blow, the facility will have a biomass, biogas or similar energy generating facility backup, which results in its classification as a hybrid. FIT of THB 3.66(?)

Business case 4 – VSPP (max 10 MW): According to an announcement of the Energy Policy and Planning Office (EPPO) from November 2016, in 2017 solar farm licenses for VSPP will be granted to private firms (without governmental or quasi-governmental participation). The FiT will drop from 5.66 baht in 2016 to 4.12 baht in 2017 and 2018.

Solar, but also biomass and other renewable energy facilities with a total capacity of 289 MW will be the subject of VSPP licenses during this year. Terms and conditions to be announced soon by the ERC.

Do you like to know more? The law firm keeps foreign companies up-to-date on investment opportunities in Thailand’s energy and infrastructure sectors in its newsletter “Seven Opportunities“. Further information is available here.

Business case 5 – SPP non-firm (10+ – 90 MW): Power producing licenses to solar farm SPP (small power producer with a total power-generating capacity of 10-90MW) are currently under consideration.

Business case 6 – Rooftop with license: Thailand’s energy policymakers started to provide the private sector with better access to the state solar rooftop program in an attempt to promote the use of solar power. The program is now allowing private companies to apply for solar rooftop development licenses. Currently, companies are still barred from selling power back to utilities. Households and factories may be allowed to sell electricity from solar rooftops to the national power grid starting September 2017. It is yet undecided by the government whether this will need a license or not.

Business case 7 – Rooftop without a license: To go one step further, the solar power production for self-consumption (without the need for a power production license) will most likely gain relevance and importance. This relates in particular to solar rooftop PV facilities which currently have roughly 5% of Thailand’s total solar markets. Net metering and a smart grid concept are buzzwords for new technologies and policies.

The solar energy market in Thailand is still very active. PVTECH, the London-based solar industry authority wrote about our solar energy 2017 research <here> Our insights had been published in the Thailand Country Report of the Asian Power Magazine <here>. Ask the law firm for more details and a comprehensive support and legal assistance of your alternative energy project. More about solar energy in Thailand at pugnatorius.com/category/solar

This post has been published: Pugnatorius Ltd.

On Grid and Off Grid Explained

On Grid – Save Money

ongrid systeml

All on grid systems worldwide require a working grid connection to function. In case of a powercut, the system will not function for safety reasons.


On Grid Plus – Save Money + Power Cut Protection

ongrid plus small

This is on grid but with the benefit of battery backup to protect against power cuts. During a power cut you have power in the batteries sufficient to run a cut-down list of the appliances in your house for a period of time.


Off Grid – Power Anywhere anytime!

offgrid system

Off Grid systems are for places with no possible connection to the grid.

 

Read more ...

News

Solar panel makers hit by shortage of key material

15 November 2017

Solar panel makers hit by shortage of key material NEW YORK: Solar manufacturers are being battered by higher costs and smaller margins after an unexpected shortage of a critical raw material. Prices of polysilicon, the main component of photovoltaic cells,...

Solar cars begin race across Australian desert

Solar cars begin race across Australian desert

17 October 2017

  Solar cars begin race across Australian desert   SYDNEY (Reuters) - The World Solar Challenge began on Sunday with 42 solar cars crossing Australia’s tropical north to its southern shores, a grueling 3,000 km (1,864 mile) race through the...

Households allowed to sell solar power

Households allowed to sell solar power

08 September 2017

Households allowed to sell solar power                       The government will end the decade-long restriction on households and commercial buildings selling power generated by their solar rooftops to state utilities in...

Seven opportunities: Thailand Solar Energy Update 2017

Seven opportunities: Thailand Solar Energy Update 2017

05 September 2017

While Thailand seemed to outshine ASEAN in solar power in 2015, the developments in 2016 showed delays and uncertainties. However, after only 470 MW solar power had been installed in 2014 and 722 MW in 2015, according to the latest data officially published...

3D-printed solar panels are the key to green energy in developing countries

3D-printed solar panels are the key to green energy in developing countries

25 August 2017

3D-printed solar panels are the key to green energy in developing countries Now that public interest in solar has skyrocketed, engineers have been rushing to find more flexible and durable alternatives to older solar panels. At the same time, the makeup of...

BREAKING: SolarWorld files for insolvency

BREAKING: SolarWorld files for insolvency

12 May 2017

Pioneering solar manufacturer SolarWorld AG is insolvent. It is unclear whether the company’s U.S. subsidiary must now file as well. Citing “ongoing price distortions” within the market and “no longer a positive forecast for the future”, Germany’s SolarWorld AG is...

Electricity bills poised for increase Higher gas prices set to induce 4% hike

Electricity bills poised for increase Higher gas prices set to induce 4% hike

21 April 2017

Electricity bills poised for increase Higher gas prices set to induce 4% hike Electricity bills are set to rise throughout 2017 because of rising natural gas and oil prices, says the Energy Regulatory Commission (ERC). ERC commissioner and spokesman Veeraphol...

Sun at zenith over Thailand in April

Sun at zenith over Thailand in April

11 April 2017

Sun at zenith over Thailand in April The sun will be at zenith in Bangkok on April 27, although it may not be the hottest day due to various factors, a senior official at the Science and Technology Ministry's National...

Lyon Group to build world’s largest solar-plus-storage project in South Australia

Lyon Group to build world’s largest solar-plus-storage project in South Australia

03 April 2017

Brisbane-based renewable energy investor Lyon Group will soon start building a AU$1 billion (US$767 million) solar-plus-storage farm in South Australia - the world’s largest. The Riverland project will include 330MW of solar PV requiring AU$700 million investment alongside a 100MW/400MWh...

Gamesa secures début order for its G126-2.625 MW turbine: it will supply 52.5 MW in Thailand

Gamesa secures début order for its G126-2.625 MW turbine: it will supply 52.5 MW in Thailand

11 February 2017

Gamesa, a global technology leader in wind energy, continues to shore up its sales and product strategy, having secured the first order for its new turbine, the G126-2.625 MW, a product which delivers maximum output in low wind speed conditions....

Thailand Renewables Report Q1 2017

Thailand Renewables Report Q1 2017

21 December 2016

Thailand Renewables Report Q1 2017 LONDON, Dec. 18, 2016 /PRNewswire/ -- Includes 3 FREE quarterly updates Driven by supportive policy and regulatory environment as well as government's commitment to diversify the country's power mix, Thailand's non-hydro renewables sector will register...

New feed-in-tariff for small power producers

New feed-in-tariff for small power producers

05 October 2016

Small solar energy producers face cut in rate THE National Energy Policy Committee yesterday agreed to reduce the tariff for small solar energy producers. Energy Minister General Anantaporn Kanjanarat said the supreme energy board has resolved to revise the feed-in-tariff...

Chiang Rai to promote alternative energy to achieve farming cost reductions

Chiang Rai to promote alternative energy to achieve farming cost reductions

29 August 2016

BANGKOK, 28 August 2016 — The province of Chiang Rai has been promoting the use of alternative energy to help achieve a sustainable reduction in farming costs.  Deputy Governor of Chiang Rai , Prajon Prajsakul chaired a seminar on Saturday...

The comeback of the sun: The solar rooftop projects

The comeback of the sun: The solar rooftop projects

15 July 2016

Thailand has a high potential to finance rooftop solar facilities in Thailand and to provide the customer with the panels, know how and infrastructure to accomplish the construction by a one-stop-shopping solution. Such business model can be limited to facilitate the self-consumption of...

THE COMEBACK OF THE SUN - THAILAND II: THE PROJECTS

THE COMEBACK OF THE SUN - THAILAND II: THE PROJECTS

15 July 2016

This post informs about projects in the solar industry with a focus on foreign investment opportunities. Updated project information and an overview about Thailand's regulatory framework can be found at http://pugnatorius.com/solar/  Here you find historical information about (i) the delayed Agro-Solar Project 2015/2016, (ii)...

Seraphim Attended Symposium on New Testing Standards of Solar Module and Materials organized by TÜV SÜD

Seraphim Attended Symposium on New Testing Standards of Solar Module and Materials organized by TÜV SÜD

12 July 2016

Recently, as one of the first companies applying the new testing standards, Seraphim was invited to the symposium on new standards of solar module and materials organized by TÜV SÜD. TÜV SÜD is a worldwide professional 3rd-party testing body, and...

Seraphim Solar Launches Higher Efficiency Module "Eclipse" Globally

Seraphim Solar Launches Higher Efficiency Module "Eclipse" Globally

03 June 2016

JACKSON, Miss., March 1, 2016 -- Seraphim Solar USA Manufacturing, Inc. (hereafter referred to as "Seraphim"), is proud to introduce our new high efficiency module the "Eclipse" to the global market. The product will be launched at PV Expo in...

Nanomaterials could double efficiency of solar cells by converting waste heat into usable energy

Nanomaterials could double efficiency of solar cells by converting waste heat into usable energy

31 May 2016

An experimental solar cell created by MIT researchers could massively increase the amount of power generated by a given area of panels, while simultaneously reducing the amount of waste heat. Even better, it sounds super cool when scientists talk about...

Trina Solar begins module production in Thailand

Trina Solar begins module production in Thailand

01 May 2016

The world’s largest PV maker has also signed $143 million in financing agreements for the factory in Rayong, Thailand.Trina Solar reports that it has begun production at its PV cell and module factory in Rayong Thailand, which has the capacity...

SMA unveils high voltage Tesla storage system

SMA unveils high voltage Tesla storage system

17 March 2016

German solar inverter giant SMA has unveiled its new Sunny Boy Storage 2.5 inverter, which can be coupled with Tesla’s PowerWall. SMA says that its AC coupled unit cuts Sunny Boy storage power electronic costs by half. Last week SMA...

our partners and products have the following certificates

logo solaris s 120